Think & Tinker, Ltd.
P.O. Box 1606, Palmer Lake, CO 80133
Tel: (719) 488-9640, Fax: (866) 453-8473
Sales: Sales@ThinkTink.com, Support: Support@ThinkTink.com
Think
&
Tinker
Ltd.





SkypeMe at
"thinkntink"
PREVIOUS navbutn.gif (1645 bytes) NEXT
Acid-Copper Electroplating Module
Model 1000 Manual - Getting things ready - Unpacking I

Getting things ready

Unpacking

  1. While unpacking the crate, inspect the unit for damage. If any damage is found, report it to Think & Tinker immediately.
  2. Place the cart in a well lit, well ventilated work space.
  3. Unpack all of the system components and inspect them for damage. As above, if any damage is found, report it to Think & Tinker, Ltd. immediately.

Cart top components
Figure 3

  1. The cathode clamp is taped to the inside of a cart leg. Remove the tape, but leave the clamp in place until you are ready to leach the tank.
  2. Unbolt the anode baskets from the buss bar and remove each one from the anode hanger plate. Remove the anode hanger plate.
PREVIOUS navbutn.gif (1645 bytes) NEXT


Established 1990

On the web since 1994

Payment Processing
Sales: 1-(719) 488-9640    Tech Support: 1-(719) 488-9640    Fax: 1-(866) 453-8473
Copyright © 1994 - 2014 Think & Tinker, Ltd. Updated 2/13/2014 8:36:56 AM